We've made a start and shifted all the asbestos!
|
This is the ceiling of the rotton floor we need to replace
|
This is a dogy beam can we just bodge it stable somehow?
|
This is my pretty house, all the windows are open today cos I'm trying to dry it out (some hope)
|
This is the kitchen and it will be a kitchen and dinner will be ready in 4 weeks time!
|
This is the source it's at the back of the kitchen I'm trying to see it as a feature rather than a problem!
|
The dodgy beam is directly below this people say not to walk on the floor but I've got to to do stuff
|
One day there will be a staircase here in the meantime I struggle with my vertigo
|
The roof is new (20 yrs ago) but a tile slipped so 20 yrs of heavy rain have been pouring down here it's caused lots of damage
|
The view, the best bit this is really something to look at
|
This is the floor covered in the ceiling!
|
This is the same bleeming floor after me and my 12yr old builders mate cleared it out
|
Work has stalled for a couple of days due to this late snow
|
One result of the snow which has now melted is that we've realised our tempory roof repair has had as much effect on the leaking as a hair net!
|